Smart Solutions Case Studies

Smart Solutions case studies highlight how MCAA contractors and Manufacturer/Supplier Council members collaborate to improve productivity, manage costs, and solve real‑world project challenges. Each case study focuses on practical applications of products, technologies, and processes that deliver measurable results across mechanical construction, service, fabrication, and operations.

Through real project examples, Smart Solutions provides insight into how contractors are applying innovative solutions to streamline workflows, improve coordination, and enhance overall performance. Explore the case studies below to identify ideas, approaches, and proven practices that can be adapted to your own operations.

Filters

Category

Manufacturer/ Supplier

Contractor

Sauer Group Selects Anvil Products to Support the World’s Tallest Launch Pad Water Tower

To support a massive water tower for a NASA launch pad, Sauer Group Inc. employed Anvil pipe supports and rollers for their durability and history of quality manufactured products. When rockets and spacecraft launch from NASA’s flight facility at the Mid-Atlantic Regional Spaceport (MARS) on Wallops Island, VA, the engine exhaust generates an enormous amount of heat and vibration. To keep the launch pad cool, stable, and safe, a special deluge system pumps water from a 307-foot water tower, the tallest in the world. The Sauer Group’s support structure keeps the deluge system safe during tumultuous takeoffs.

Sauer Group Increases Productivity by 300 Percent with Tri Tool High-Performance Welding Solutions

Sauer Group wanted to ensure high-quality welds while reducing time and costs on a natural gas processing station project, so they used Tri Tool Inc.’s AdaptARC® system, configured for flux core arc welding (FCAW) deposition, which increased productivity 300 percent over traditional stick welding. Brian Stahovec, project superintendent for Sauer Group, said, “The welding process we’re using was developed by Tri Tool in conjunction with Sauer especially for this project. Utilizing that method, we’ve been able to not only cut costs but also make sure the schedule’s been maintained.”