Smart Solutions Case Studies

Smart Solutions case studies highlight how MCAA contractors and Manufacturer/Supplier Council members collaborate to improve productivity, manage costs, and solve real‑world project challenges. Each case study focuses on practical applications of products, technologies, and processes that deliver measurable results across mechanical construction, service, fabrication, and operations.

Through real project examples, Smart Solutions provides insight into how contractors are applying innovative solutions to streamline workflows, improve coordination, and enhance overall performance. Explore the case studies below to identify ideas, approaches, and proven practices that can be adapted to your own operations.

Filters

Category

Manufacturer/ Supplier

Contractor

Erickson’s Aircrane Cuts The Hill Group’s Installation Time Down to Hours

In the summer of 2016, The Hill Group called on Erickson Inc. to lift and place cooling towers and chillers by air into a building in crowded downtown Chicago, accomplishing the goal in hours compared with weeks needed for other methods. The project was located at East Randolph Street in a crowded landscape with multilevel streets and nearby residential buildings, so land crane equipment was not an option. Using Erickson’s precision capabilities, aerial crane operators placed chiller equipment through a hole in the roof, with inches to spare, and then set it 15’ below the roof level.

Erickson Incorporated Gives Hill Group a Big Lift

Thanks to Erickson Incorporated, a global provider of innovative aerial services, The Hill Group saved around $45,000 on several heavy lifts along the downtown lakefront of Chicago, IL, in one day. They also shortened their project timelines considerably.